Torino Pinnacle (Phase 2) Offsite Civil

February 22, 2021

October – December 2020 Project Owner: Pinnacle International/Mondiale Development

Montrose Square – Offsite Civil

February 22, 2021

November – December 2020 Project Owner: Quantum Properties Project Value: $350,000 Quantum Properties as the developer, Terra was awarded the Montrose Square Offsite Civil project in the Fall of 2020. Despite the site’s limited working space and laydown area, Terra was still able install approximately 200m of 600mm and 750mm concrete pipes by tremendous sequencing […]

Maple Ridge Culvert Replacement on 132 Ave

February 22, 2021

September – October 2020 Project Owner: City of Maple Ridge Terra was awarded the Maple Ridge Culvert Replacement on 132 Ave by the City of Maple Ridge. This project involved Terra removing two 25 m long, 1500 mm diameter corrugated steel pipe and replacing them with two 25 m long, 2400 x 1500 mm box […]

SFU Culvert Replacements

February 22, 2021

August – September 2020 Client: Simon Fraser University Project Value: $950,000 Parsons as the consulting engineer, Terra was awarded the project by Simon Fraser University in the summer of 2020. Despite the environmental sensitive and tight construction schedule, Terra was able to remove and reinstate 3 new proposed culverts along University Drive East at SFU […]

Westbury Development

February 22, 2021

April – August 2020 Client: Gryphon Development Project Value: $250,000 Project Name: Westbury Development (4066 Macdonald Street, Vancouver)

University Of British Columbia Infrastructure Project: The Counselling Service Civil Works

August 12, 2020

September 2019 – April 2020 Client: The University of British Columbia The project was awarded to Terra by the UBC Properties Trust. Under strict time constraint, Terra was able to accommodate the team from Metric Modular to install site services for a modular facility while working around other subcontractors around the area. Traffic control was […]

Boyd Street, Wood Street, And Johnston Street Storm Network Upgrades

August 12, 2020

October – November 2019 Client: City of New Westminster Project Value: 1.2 million Aplin and Martin as the consulting engineer, Terra was awarded the project by City of New West in the summer of 2019. Despite the tight project schedule to ensure canal capacity was improved before the fall season, Terra was able to complete […]

The Heights – Charland Avenue, Coquitlam

August 12, 2020

May – December 2019 Client: Allaire Construction Inc. Project Value: 1.0 million Terra Contracting was awarded the offsite civil contract for The Heights development by Allaire Construction.  For this project, Terra installed 140 m of new water main connection from the development site to the intersection of Austin Avenue and Blue Mountain Street in the […]

BC Housing Projects

August 12, 2020

2017-2020 Client: Horizon North Logistics Inc Project Value: 2.0 million Terra Contracting was awarded multiple contracts to complete site preparation and site services at various Housing sites in the City of Vancouver. Scope of work includes onsite and offsite site services with sanitary/storm/water tie-ins; site preparation; retaining wall and backfill; and hardscape/landscape. All the project […]

Scotiabank

February 22, 2019

ADDRESS: 420 – 745 Thurlow Street LOCATION: VANCOUVER, BC