Bulk

  • The Oaks by Strand – Phase 2 Excavation and ShoringThe Oaks by Strand - Phase 2 Excavation and Shoring
    September 2020 – February 2021 Client: Axiom Builders Inc. Project Value: $1,425,000 730 Clarke Road, Coquitlam After successfully completing phase 1, Terra Contracting was awarded the Phase 2 excavation and shoring for The Oaks by Strand. This project entails 8 m of bulk excavation and the installation of 4 rows of conventional anchor. The geotechnical consultant for this project ...
    Read more
  • The Oaks by Strand – Phase 1 Excavation and ShoringThe Oaks by Strand - Phase 1 Excavation and Shoring
    December 2019 – July 2020 Client: Axiom Builders Inc. Project Value: $2,100,000 730 Clarke Road, Coquitlam Terra Contracting was awarded the Phase 1 excavation and shoring for The Oaks by Strand located in Coquitlam. This project required terra to bulk excavate an average of 8 m below existing ground elevations and install 4 rows of anchors with shotcrete. As ...
    Read more
  • Maywood on the Park – Excavation and ShoringMaywood on the Park - Excavation and Shoring
    September 2019- June 2020 Client: Axiom Builders Inc. Project Value: $4,850,000 6463 Silver Ave, Burnaby Terra Contracting was awarded the Maywood on the Park excavation and shoring project by Axiom Builders. This project required Terra to bulk excavate up to 18 m below existing ground elevations and the installation of 9 rows of anchors with shotcrete. The geotechnical consultants ...
    Read more
  • Main and Twentieth – Excavation and ShoringMain and Twentieth – Excavation and Shoring
    March 2018 – January 2019 Client: Landa Global Properties Project Value: $1,200,000 209 East 20th Avenue, Vancouver Terra Contracting was awarded the exaction and shoring project for Main and Twentieth by Landa Global Properties. This project involved Terra excavating to a depth of 6 m below ground elevation and installing 3 rows of anchor and shotcrete. The geotechnical consultant ...
    Read more
  • Park House Living Phase 1 & 2– Excavation and ShoringPark House Living Phase 1 & 2– Excavation and Shoring
    Feb 2019 – Aug 2019 Client: Syncra Construction Project Value: $2,150,000 488 & 477 West 59th Avenue, Vancouver Terra Contracting was awarded the Park House Living Phase 1 and 2 project located near the Cambie St and W 58th Ave intersection in Vancouver. This project featured two identical 6-story residential buildings directly adjacent to one another. Both buildings required ...
    Read more
  • The Moody Rentals – 3131 St. Johns, Port Moody – Excavation and ShoringThe Moody Rentals - 3131 St. Johns, Port Moody – Excavation and Shoring
    May 2019 – Dec 2019 Client: Trillium Project Management Ltd. Project Value: $2,100,000 3131 St. Johns, Port Moody Terra Contracting was awarded the bulk excavation and shoring project at 3131 St Johns, Port Moody. This project involved Terra excavating 9 m below existing ground and 5-rows of anchor. The geotechnical consultant for this project were GeoPacific. For this project, Terra ...
    Read more
  • Yukon ResidencesYukon Residences
    ADDRESS: 7525 Yukon Street LOCATION: VANCOUVER, BC
    Read more
  • The Henry CondoThe Henry Condo
    ADDRESS: 5389 Cambie Street LOCATION: VANCOUVER, BC
    Read more
  • The RoderickThe Roderick
    ADDRESS: Moncton & 3rd Avenue LOCATION: RICHMOND, BC
    Read more
  • AtkinsAtkins
    ADDRESS: 2356-2378 Atkins Avenue LOCATION: PORT COQUITLAM, BC
    Read more