Boyd Street, Wood Street, and Johnston Street Storm Network Upgrades

August 12, 2020

October 2019 – November 2019 Client: City of New Westminster Project Value: 1.2 million Aplin and Martin as the consulting engineer, Terra was awarded the project by City of New West in the summer of 2019. Despite the tight project schedule to ensure canal capacity was improved before the fall season, Terra was able to […]

The Heights – Charland Avenue, Coquitlam

August 12, 2020

May 2019 – December 2019 Client: Allaire Construction Inc. Project Value: 1.0 million Charland Avenue, Coquitlam, BC Terra Contracting was awarded the offsite civil contract for The Heights development by Allaire Construction.  For this project, Terra installed 140 m of new water main connection from the development site to the intersection of Austin Avenue and […]

Lower Mainland Intermediate Pressure System Upgrade Project

August 12, 2020

October 2017 – April 2018 Client: FortisBC Energy Inc. Project Value: 1.9 million The project consisted in locating and exposing of undergroundutilities at specified crossing locations throughout Coquitlam,Burnaby and Vancouver. Over 250 existing underground utilitieswere conducted along a stretch of 22km. Work inclusive ofhydro-excavation and machine excavation, survey backfill andfull restoration to existing conditions and […]

BC Housing Projects

August 12, 2020

2017-2020 Client: Horizon North Logistics Inc Project Value: 2.2 million Terra Contracting was awarded multiple contracts to complete site preparation and site services at various Housing sites in the City of Vancouver. Scope of work includes onsite and offsite site services with sanitary/storm/water tie-ins; site preparation; retaining wall and backfill; and hardscape/landscape. All the project […]

Sapperton Ground Improvement

August 12, 2020

December 2019 – August 2020 Client: Canadian Pacific Railway Company Project Value: 7.6 million A design build contract awarded by CP Rail, with track expansion work up to 3 Kilometers Long. The track expansion crossed multiple Ministry Transportation overpasses, and Trans mountain utility crossing. The scope of work included the design and construction of ground […]

Scotiabank

February 22, 2019

ADDRESS: 420 – 745 Thurlow Street LOCATION: VANCOUVER, BC

Yukon Residences

February 22, 2019

ADDRESS: 7525 Yukon Street LOCATION: VANCOUVER, BC

The Henry Condo

November 20, 2018

ADDRESS: 5389 Cambie Street LOCATION: VANCOUVER, BC

The Roderick

November 20, 2018

ADDRESS: Moncton & 3rd Avenue LOCATION: RICHMOND, BC

Atkins

November 20, 2018

ADDRESS: 2356-2378 Atkins Avenue LOCATION: PORT COQUITLAM, BC