Beachborough Offsite Civil Project

July 10, 2024

September 2018 – April 2020 Client: Allaire Construction Inc. Project Value: $1,200,000 14034 North Bluff Road, White Rock Terra Contracting was awarded the offsite civil work for the Beachborough development located in the City of White Rock by Allaire Construction. This project involved Terra installing 110 m of new water main along the intersection of […]

Port Coquitlam Yard Lagoon Decommissioning And Stormwater Infrastructure Upgrade

July 10, 2024

December 2019 – April 2020 Client: Canadian Pacific Railway Project Value: 0.7 Million As a direct contractor to CP, Terra is E-Rail Safe and ISNet world certified. The two certifications allow contractors to exemplify the ability to conduct work in a safe, environmental compliant, and systematic way. The project started in fall of 2019, and […]

Port Moody Cascade Capacity Expansion Project – Culvert Extensions

July 10, 2024

February  – April 2020 Client: Canadian Pacific Railway The Cascade track expansion project is located near Suncor plant along the Burrard Inlet. The track expansion runs 12km total along the most sensitive part of Burrard Inlet. Terra was tasked to complete all culvert realignment and extension as part of the track expansion. With strategic water […]

University Of British Columbia Infrastructure Project: The Counselling Service Civil Works

July 10, 2024

September 2019 – April 2020 Client: The University of British Columbia The project was awarded to Terra by the UBC Properties Trust. Under strict time constraint, Terra was able to accommodate the team from Metric Modular to install site services for a modular facility while working around other subcontractors around the area. Traffic control was […]

Park House Living Phase 1 & 2 – Excavation and Shoring

July 10, 2024

February 2019 – August 2019 Client: Syncra Construction Project Value: $2,150,000 488 & 477 West 59th Avenue, Vancouver Terra Contracting was awarded the Park House Living Phase 1 and 2 project located near the Cambie St and W 58th Ave intersection in Vancouver. This project featured two identical 6-story residential buildings directly adjacent to one […]

The Moody Rentals – Excavation and Shoring

July 10, 2024

May 2019 – December 2019 Client: Trillium Project Management Ltd. Project Value: $2,100,000 3131 St. Johns, Port Moody Terra Contracting was awarded the bulk excavation and shoring project at 3131 St Johns, Port Moody. This project involved Terra excavating 9 m below existing ground and 5-rows of anchor. The geotechnical consultant for this project were […]

Main and Twentieth – Excavation and Shoring

July 10, 2024

March 2018 – January 2019 Client: Landa Global Properties Project Value: $1,200,000 209 East 20th Avenue, Vancouver Terra Contracting was awarded the excavation and shoring project for Main and Twentieth by Landa Global Properties. This project involved Terra excavating to a depth of 6 m below ground elevation and installing 3 rows of anchor and […]

SFU Culvert Replacements

July 10, 2024

August 2020 – September 2020 Client: Simon Fraser University Project Value: $950,000 With Parsons as the consulting engineer, Terra was awarded theproject by Simon Fraser University in the summer of 2020. Despitethe environmental sensitive and tight construction schedule,Terra was able to remove and reinstate 3 new proposed culvertsalong University Drive East at SFU within a […]

Westbury Development

July 10, 2024

April 2020 – September 2020 Client: Gryphon Development Project Value: $250,000 4066 Macdonald Street, Vancouver, BC Terra Contracting was awarded the Westbury Offsite Civiland Roadworks project by Kindred Construction and GryphonDevelopment. For this project, extensive communication andcoordination were required to work efficiently and safely withother trades on site due to the limited working space. Terra’s […]

Montrose Square – Offsite Civil

July 10, 2024

November – December 2020 Project Owner: Quantum Properties Project Value: $350,000 Quantum Properties as the developer, Terra was awarded the Montrose Square Offsite Civil project in the Fall of 2020. Despite the site’s limited working space and laydown area, Terra was still able install approximately 200m of 600mm and 750mm concrete pipes by tremendous sequencing […]